Heavy-duty shelves installation methods and steps

Source:m.fzl2.com Author:思特博貨架拆裝 Date:2024-01-31 Views:

How to install heavy-duty shelves?The installation process of heavy-duty shelves. There will always be more or less problems during the installation process of heavy-duty shelves. Either the part is missing or the tool does not know where to put it. Therefore, the installation employees must pay attention to the installation process of heavy-duty shelves. , so that the installation of heavy-duty shelves can be completed in an orderly manner without any problems of this kind.The following is a detailed introduction to the installation process of heavy-duty shelves.

 33263876d18b5b9bc5c0cf3e7f6d069e_1655560879468679.jpg

1. Assembly of column pieces.

1. Take out the two columns and arrange them in the same order.

2. Take out the horizontal diagonal brace (the long one is the diagonal brace, the short one is the horizontal brace), and align a horizontal brace with the screw hole closest to the foot of the column (the opening faces upward). 

3. Place the washer (block) on it.

4. Tighten the nut before inserting the screw (no need to tighten).

5. Put the other end of the cross brace into the same position of the other column, align a diagonal brace with the hole and put it into this column (with the opening facing downwards), insert the spiral thread and screw it on (no need to tighten it) ).

6. Align the other end of the diagonal brace with the higher hole of the other column, take out another diagonal brace, insert the screw, and tighten the nut.Install all diagonal braces accordingly.

7. When it is installed at the top hole, take a horizontal brace and install it on the column together with the end of the last installed diagonal brace.

8. Place a washer (block) on the other end of the cross brace and install it into the column.

9. Install all the column pieces in this way and tighten all the screws with a wrench.

    

2. Installation of cross beams

1. Stand up a column piece (with the feet facing down) and snap one end of the beam into the appropriate position of the column piece.(The bayonet of the cross beam faces downward, which means the safety pin hole faces downward) 

2. Insert the safety pin.

3. Accordingly, set up another column piece to install the other end of the beam, and then install all the beams according to the actual cargo placement requirements.

 

3. Installation of partitions.

1. Insert the partitions into the appropriate position of each crossbeam (a position that can support the pallet). To maintain a beautiful appearance, each partition should be placed in the same direction.

2. Installation of sub-frame.One end of the sub-frame cross beam is installed on the column piece of the adjacent shelf.

3. Fixation of position.Arrange the shelves neatly according to the drawings or actual placement requirements.

4. Fix the bottom corner.

5. Use an impact drill (the drill bit is selected according to the expansion bolt provided) to drill holes at the fixing point of the shelf foot.

6. Insert the expansion bolt into the drilled hole, smash it down with a hammer, and tighten it with a wrench.


TAG:
Link:
Solemn statement: do not reprint the pictures of this website without permission. Violators will be prosecuted!
CONTACT
In the future, the company will continue to adhere to the concept of professional development, continue to broaden its business ideas and business scope, make continuous improvements in product research and development, market development, and improve service levels, and strive to become a shelf supplier trusted by customers.
+86(10)-57794990 / 57794760 138 0102 0776(Click) / 137 0126 4023(Click) vip@bjstb.com Company: 14-2-83-84, No. 50, Huayuan Chunhe Road, Daxing District
Scan and consult immediately
Exclusive customization welcome consultation STABLE Shelves provides high-end exclusive customized services for every distinguished guest.Fill out the form below and our dedicated service consultant will contact you.
Phone:*
Email:*
Message:*

Copyright ? 2002-2024 北京思特博貨架制造有限公司 版權(quán)所有 ICP:京ICP備16033024號

Some of the manuscripts on this website (not limited to text and pictures) are reprinted on the Internet in order to spread more information. This website does not assume joint and several liability for the infringement of such manuscripts.
If you find that any content infringes your copyright, please send the relevant content to this email [vip@bjstb.com]. After confirmation, we will delete it immediately to ensure your copyright.
LEIZHOU
Email:

TEL

WECHAT

截屏,微信識別二維碼
微信號:138 0102 0776
(點擊微信號復(fù)制,添加好友)
打開微信
色88久久久久高潮综合影院| 人妻另类 专区 欧美 制服| 亚洲国产精品成人综合色在线 | 国产av人人夜夜澡人人爽麻豆| 精品人妻无码一区二区三区换脸| 波多野结衣网站| 精品人妻无码一区二区三区牛牛| 久久精品国产亚洲77777| 狠狠躁夜夜躁av网站中文字幕 | 亚洲中文字幕无码专区| 娇妻系列交换200篇| 人人妻人人澡人人爽欧美一区 | 伊人情人综合网| 夜夜躁狠狠躁日日躁视频| 无人区高清视频在线观看| 久久午夜无码鲁丝片| 国产丰满美女a级毛片| 99久久人妻精品免费二区| 法国a级情欲片性船| 中文无码成人免费视频在线观看| 饥渴偷公乱第400章| 好猛好深好爽喷水无码视频| 欧美黑人性暴力猛交喷水| 公交车上少妇迎合我摩擦| 国产日韩精品中文字无码| 久久精品国产亚洲av忘忧草18| 亚洲色婷婷久久精品av蜜桃| 亚洲 欧美 自拍 动漫 另类| 国产精品乱码一区二区三区| 亚洲国产av无码精品无广告| 亚洲精品乱码久久久久久中文字幕 | 被绑在机器上强行高潮h | 天天爱天天做天天爽| 一进去一爽又粗又大| 精品久久久久久亚洲精品| 国产伦理一区二区| 纯肉高h啪动漫| 亚洲男人天堂| 国产精品另类激情久久久免费| 免费无码国产欧美久久18| 国产韩国精品一区二区三区|